As the last week of my training, I had to spend the time on finalization of the SOP project and preparing of the training report.
I was able to finish the project and submit it to my host supervisor at the company. The project was done correctly, but with some modifications with the arrangement which I was asked to fix by Eng.Zaidi.
On Friday, the project was completely done and submitted. By submitting the project, my industrial training is considered completed.
My Industrial Training
Saturday, June 26, 2010
Friday, June 18, 2010
Week eleven: Friday, 18th of June, 2010
I started working on the third topic of my project which is constructing the manhole. I managed to collect all information and pictures that involves constructing of the manhole.
The collected information and pictures that cover the equipments, permits, steps, reinforcement concrete design and some cautions that must be considered during the construction.
The collected information and pictures that cover the equipments, permits, steps, reinforcement concrete design and some cautions that must be considered during the construction.
Thursday, June 17, 2010
Week eleven: Thursday, 17th of June, 2010
Wednesday, June 16, 2010
Week eleven: Wednesday, 16th of June, 2010
Today, 10am was the visit of my supervisor Dr. Zakaria and my host supervisor Eng. Zaidi.
At the afternoon, I continued working on the project and industrial training report.
At the afternoon, I continued working on the project and industrial training report.
Tuesday, June 15, 2010
Week eleven: 14th and 15th of June, 2010
In this week, it will be my supervisor visit to the company in order to meet my host supervisor and discuss about my training program process.
The visit will be on the 16th which is Wednesday, so I decided to prepare my logbook and review what I have learned so far during my training program.
The visit will be on the 16th which is Wednesday, so I decided to prepare my logbook and review what I have learned so far during my training program.
Friday, June 11, 2010
Week Ten: 8th to 11th of June, 2010
I spent the days reading about geographic information system (GIS).
Geographical information system, is any system that captures, stores, analyzes, manages, and presents data that are linked to location. In the simplest terms, GIS is the merging of cartography and database technology. GIS systems are used in cartography, remote sensing, land surveying, utility management, photogrammetry, geography, urban planning, emergency management, navigation, and localized search engines.
I learned that GIS is based on the following:
• Drawing using AutoCAD
• Drawing single diagram (SLD)
• Technical Rating Field (Field data collection form ) (using Excel)
In TNB, GIS is used to locate the manholes positions and ducts path and helping in managing the distribution process.

Red lines represent the ducts path
Yellow squares represent the manhole positions
Geographical information system, is any system that captures, stores, analyzes, manages, and presents data that are linked to location. In the simplest terms, GIS is the merging of cartography and database technology. GIS systems are used in cartography, remote sensing, land surveying, utility management, photogrammetry, geography, urban planning, emergency management, navigation, and localized search engines.
I learned that GIS is based on the following:
• Drawing using AutoCAD
• Drawing single diagram (SLD)
• Technical Rating Field (Field data collection form ) (using Excel)
In TNB, GIS is used to locate the manholes positions and ducts path and helping in managing the distribution process.

Red lines represent the ducts path
Yellow squares represent the manhole positions