Today I stayed in the office for the whole day. I spent the time preparing and arranging the topics that will be included in the SOP module 2 and set up the outline and schedule to be followed.
Topics of SOP module 2:
a.Procedure for Horizontal Directional Drilling (HDD)
b.Procedure for Manhole installation (11KV)
c.Procedure for Manhole construction (33KV)
d.Procedure for Ducting installation
e.Procedure for Sup station construction
Each topic will cover the following:
a.Objective
b.Equipment
c.Permits
d.Steps