Tuesday, May 11, 2010

Week Six: Tuesday, 11th of May, 2010

I joined Mr. Kamal to IT park, Block D, which contain a ducting works for a sloped ground.
There was a problem occurred at the site which is a sewerage pipe was found across the middle level of the ducts path.




The contractor has came out with a good solution which is merging the four levels of the ducts and make two levels which will be easy to bend it above the sewerage pipe as shown below: