By the end of this one month, a training report must be done and submitted to the supervisor at the company.
I also joined Mr. Kamal to site 17RK3 where two new manholes were being installed. I also joined him to site 18R5 to check the work progress of installing electrical pits in front of the residential houses which are being built at the site.
Manhole parts:
Installing the parts to the hole:
Jointing the parts using bolts: